Landing Gear Maintenance Software | LG Overhaul & LLP Tracking | OxMaint

By Josh Turly on May 26, 2026

landing-gear-maintenance-software--lg-overhaul-&-llp-tracking--oxmaint

Landing gear program managers carry one of the most consequential maintenance tracking responsibilities in aviation. Every cycle count, every life-limited part interval, every overhaul threshold, and every exchange-pool swap carries direct airworthiness and operational consequence. Manual cycle tracking on spreadsheets, paper travellers for LLP status, and verbal exchange-pool coordination create hard-time removal exposure that no landing gear program can afford. OxMaint's landing gear maintenance software delivers cycle-based program tracking, LLP life management, overhaul interval automation, and exchange-pool planning — integrated with the work-order engine so nothing slips to a hard-time overrun.

LANDING GEAR MAINTENANCE · LLP TRACKING · OVERHAUL PLANNING · 2026
Purpose-Built Landing Gear Maintenance Software for Cycle, LLP & Overhaul Control
OxMaint delivers cycle-based landing gear program tracking, LLP hard-time management, exchange-pool planning, and brake/tire wear logging — integrated with your work-order engine from day one.

What Landing Gear Maintenance Software Must Deliver in 2026

Landing gear program managers face cycle-accumulation complexity across mixed fleets where MLG and NLG components run different LLP intervals, shock strut overhaul thresholds vary by operator and calendar, and exchange-pool assets cycle between tail numbers without consistent tracking. A landing gear tracking platform that cannot synchronize aircraft cycle counts with LLP remaining life, automate hard-time removal alerts, and plan exchange swaps against inbound overhaul windows creates compliance exposure on every departure. You can Sign Up Free and configure your first cycle-based LLP tracking record within the same shift. For programs managing multi-fleet exchange pools, Book a Demo to see overhaul interval automation and exchange-pool planning in your operational context.

Cycle-Based LLP Life Tracking

Track remaining cycles for every LLP on every MLG and NLG assembly — synchronized against aircraft cycle accumulation — with hard-time removal alerts before expiry on any tail number.

Overhaul Interval Automation

Automate overhaul due dates by cycles, calendar, and flight hours per landing gear assembly — with advance alert windows configurable per operator maintenance program requirements.

Exchange Pool Planning

Manage serviceable gear inventory against inbound overhaul schedule — tracking pool asset status, expected release dates, and allocation against planned removals across the fleet.

Brake & Tire Wear Logging

Record brake wear measurements, tire tread depth, and pressure checks at each check event — trending wear rates per position and triggering replacement work orders before minimums are reached.

Shock Strut Maintenance Tracking

Track shock strut servicing intervals, extension measurements, and seal replacement history per gear assembly — with work-order generation at configured service thresholds.

Landing Gear Inspection Records

Digital inspection task cards for visual and NDT checks — with finding capture, corrective action records, and sign-off documentation auto-built at inspection close for regulatory export.

Landing Gear Software vs Generic CMMS: Why Cycle Intelligence Matters

Generic work-order platforms track maintenance tasks and asset records — but landing gear program management demands cycle-synchronized LLP tracking, hard-time removal forecasting, and exchange-pool asset planning that no facility-management CMMS provides. Here is where purpose-built landing gear software creates measurable compliance separation.

Capability Generic CMMS OxMaint Landing Gear Module
Cycle-Synchronized LLP Life Tracking Not included Native per-component
Hard-Time Removal Alert Automation Not included Configurable advance alerts
Exchange Pool Asset Planning Not included Full pool management
Brake & Tire Wear Trend Logging Generic asset only Position-level trending
Overhaul Interval Multi-Threshold Tracking Single threshold only Cycles + calendar + hours
Shock Strut Service Interval Automation Not included Full service tracking
Regulatory LLP Traceability Export Not available EASA / FAA / DGCA ready
Implementation Time 8–24 weeks Under 2 weeks

5 Operational Challenges OxMaint Solves for Landing Gear Program Managers

Landing gear program managers balance cycle-accuracy, hard-time compliance, and exchange availability simultaneously across fleets where one overrun triggers airworthiness exposure and AOG risk. These five pressure points are where purpose-built landing gear maintenance software delivers where generic tools create risk. Sign Up Free to configure your first LLP tracking record today, or Book a Demo to map each challenge against your current program management workflow.

01
Cycle Accumulation Lag: LLP Records Out of Sync With Aircraft

Manual cycle-count updates on spreadsheets consistently lag actual aircraft accumulation — creating LLP remaining-life errors that are only discovered at inspection or audit. OxMaint synchronizes LLP cycle consumption against aircraft cycle records at every update, keeping hard-time visibility accurate across every gear assembly.

02
Hard-Time Removal Surprises: No Advance Alert on Expiring LLPs

Without configurable advance-alert windows, LLP hard-time removals surface in the short-term planning window with insufficient exchange or parts lead time. OxMaint's automated LLP alert system provides configurable advance windows — giving program managers the lead time needed to schedule removals against available exchange assets without AOG exposure.

03
Exchange Pool Gaps: No Visibility Into Serviceable Asset Availability

Managing gear exchange pool availability against inbound removal schedule without a planning tool creates exchange shortfalls that ground aircraft. OxMaint's exchange-pool module tracks serviceable inventory status, expected overhaul release dates, and demand against planned removal windows — preventing exchange gaps before they become AOG events.

04
Brake & Tire Overruns: Wear Rates Not Trended Between Check Events

Recording brake wear measurements and tire tread readings without trending wear rate per position means replacement need is only identified at minimum — not in advance. OxMaint trends brake and tire wear per wheel position across check events, projecting replacement thresholds and triggering work orders before minimum limits are reached.

05
LLP Traceability at Audit: Part Records Not Linked to Work Orders

Reconstructing LLP part traceability — serial numbers, removal work orders, shop visit histories — from paper travellers during EASA or FAA audits is high-risk and time-consuming. OxMaint links every LLP record to its installation work order, removal event, and shop visit with full audit export at any point in the component lifecycle.

Landing Gear Program Management by the Numbers

$22K+
average AOG cost per event linked to unplanned landing gear removal or exchange pool shortfall
38%
of landing gear audit findings linked to LLP traceability gaps or hard-time removal documentation errors
60 days
average advance visibility OxMaint provides on hard-time LLP removals — sufficient for exchange pool preparation in most programs
2 wks
typical OxMaint deployment time for full landing gear cycle, LLP, and exchange-pool module activation

Is Your Landing Gear Program Ready for Digital Cycle & LLP Management?

Not every landing gear program starts from the same baseline. Use this framework to identify where OxMaint delivers the most immediate hard-time compliance and exchange-planning value for your operation. Sign Up Free and configure your first LLP cycle record today — or Book a Demo to see overhaul interval automation and exchange-pool planning mapped to your fleet type.

High-Impact Starting Points
LLP cycle counts managed on spreadsheets lagging actual aircraft accumulation
Hard-time removals surfacing in the short-term window with no advance alert
Exchange pool availability tracked manually with no visibility against demand
Brake and tire wear records not trended between check events
Shock strut service intervals tracked on manual boards or paper cards
LLP traceability reconstructed from paper travellers during audits
OxMaint Landing Gear Module Delivers
Cycle-synchronized LLP life tracking per component with hard-time alerts
Configurable advance-alert windows providing 30–90 day removal visibility
Exchange pool planning against inbound overhaul and removal schedule
Position-level brake and tire wear trending with replacement work-order triggers
Shock strut service automation with measurement logging per gear
Full LLP traceability linked to work orders with audit-ready export

How OxMaint Powers the Full Landing Gear Maintenance Workflow

OxMaint's landing gear module covers the complete program management cycle — from cycle accumulation and LLP life tracking through overhaul planning, exchange-pool management, and compliance documentation. Program managers gain hard-time visibility and exchange-pool control without switching between disconnected tools or reconstructing records at audit time.

Cycle Count Synchronization

Automatic cycle accumulation updates per tail number — maintaining real-time remaining-life accuracy for every LLP and overhaul threshold across the gear program.

LLP Hard-Time Removal Planning

Fleet-wide LLP expiry calendar showing upcoming hard-time removals by component, assembly, and tail — with configurable advance-alert windows and work-order auto-generation.

Overhaul Shop Visit Coordination

Structured induction work orders for gear shop visits — with LLP disposition instructions, inspection findings capture, parts tracking, and release-to-service documentation at completion.

Exchange Pool Asset Management

Serviceable gear inventory tracking against demand calendar — with pool asset status, overhaul release projections, and allocation planning for upcoming program removals.

Brake, Tire & Strut Service Tracking

Per-position brake wear, tire tread, strut extension, and pressure records at every check event — trending wear rates and triggering replacement or servicing work orders at configured thresholds.

Compliance & LLP Traceability Records

Auto-built LLP traceability records, removal work-order links, and shop visit documentation — exportable to EASA, FAA, and DGCA formats with zero post-event administrative reconstruction.

LANDING GEAR PROGRAM · LLP TRACKING · OVERHAUL PLANNING · EXCHANGE POOL
Track Every Cycle. Plan Every Overhaul. Never Miss a Hard-Time Removal.
OxMaint's landing gear module handles LLP cycle tracking, overhaul interval automation, exchange-pool planning, and brake and tire wear management — integrated with your work-order engine from day one.

Frequently Asked Questions: Landing Gear Maintenance Software

What is landing gear maintenance software and how does it differ from a standard CMMS?
Landing gear maintenance software is purpose-built for cycle-based LLP life tracking, overhaul interval management, and exchange-pool planning — capabilities no generic CMMS includes. Standard platforms lack the cycle-synchronization and hard-time removal intelligence needed for landing gear program compliance.
How does OxMaint synchronize LLP cycle counts with aircraft cycle accumulation?
OxMaint updates LLP remaining-life records against aircraft cycle accumulation inputs — maintaining real-time hard-time visibility per component across every tail number in the program without manual spreadsheet updates.
Can OxMaint manage landing gear exchange pool planning?
Yes. OxMaint tracks serviceable exchange-pool inventory against the planned removal calendar — showing asset status, expected overhaul release dates, and demand coverage so program managers can prevent exchange shortfalls before they cause AOG events.
Does OxMaint track brake wear and tire condition between check events?
Yes. OxMaint logs brake wear measurements and tire tread readings per wheel position at every check — trending wear rate per position and generating replacement work orders at configured minimums before crew reports or AOG risk.
How quickly can a landing gear program get operational with OxMaint?
Most programs complete initial cycle, LLP, and overhaul configuration within the first shift. Full landing gear module deployment typically completes in under two weeks with no consultant engagement required.
LANDING GEAR MAINTENANCE SOFTWARE · CYCLE TRACKING · LLP MANAGEMENT · OVERHAUL
Start Your First Digital Landing Gear Cycle Record Today
OxMaint gives landing gear program managers complete cycle-based LLP tracking, overhaul interval automation, exchange-pool planning, and audit-ready compliance documentation — built for hard-time precision from day one.

Share This Story, Choose Your Platform!