An inventory reorder point is the quantity at which a part has to be ordered again and it only helps if somebody can see when a part crosses it. In Oxmaint each part has a minimum, shown as Reorder at on the Stocks page, and a status worked out from it. Stocks counts what is below reorder or out of stock, shows cover as a bar against the reorder point, and links parts to order into Demand Parts. Sign up to open Stocks on the sample site.
Inventory Reorder Point per Part
A reorder point per part and a status that follows it. Sign up and open Stocks.
An Inventory Reorder Point per Part
Parts is the catalogue, what a part is. Stocks is the position, how much sits where and what it is worth. Both read the same records. The reorder point lives on the part, in its edit form beside the price, bin and preferred vendor, so it can change after the part is in the catalogue.
Sample site records from the Oxmaint portal, captured 28 Nov 2026. Your own stock will differ.
What the Stocks Page Counts
| Card | What it counts |
|---|---|
| Stock lines | Parts held, one line each |
| Total valuation | Stock at cost, not replacement value |
| Below reorder | Parts whose on hand is under the minimum |
| Out of stock | Parts with nothing on hand |
| Units held | Quantity on hand across all parts |
| Movements | Issues and receipts booked |
Below reorder counts a part when its quantity on hand is under its minimum. Out of stock counts a part with nothing on hand. A status filter narrows the list to In Stock, Low Stock or Out of Stock, and a building filter narrows it to one property.
Cover Against the Reorder Point
Each stock line shows On hand, Reorder at and a Cover bar with a percentage, which is on hand against the reorder point. A part at its reorder point reads 100 percent, a part below it reads lower and the bar turns amber, and a part with nothing on hand turns red. The line also shows its location, building and value.
Illustrative example, not sample site data.
What a Part Tells You When It Is Low
Opening a part shows its on hand and reorder at figures. When it is below, a message reads "Below reorder point" with how many are on hand out of the reorder point. When it is out, the message reads "Out of stock" and gives the reorder point. The edit form on the part is where the reorder point is changed.
Open Stocks on the Sample Site
Read the cards and the cover bars, then open a part. Sign up to the micro app and try it.
From a Low Part to an Order
Parts below their minimum, or short for open jobs, are listed on Demand Parts with a status of Requested, Sourcing or Ordered. A Raise PO button creates a purchase order for the part with its preferred vendor. A part with no vendor shows Set vendor, which opens its edit form. A part wanted that no minimum or job list has asked for can be added with Raise demand.
Illustrative example, not sample site data.
Oxmaint holds the figure you choose and works out the status from it. It does not calculate a reorder point from usage or lead time. Choose one from how long your supplier takes and how fast the part is used.
Set the reorder point high enough to cover the supplier lead time plus a margin for the busiest week. Review parts that sit at zero first, then those below their point. If a part is repeatedly below its point, raise the point or agree a faster supplier rather than ordering in a hurry each time. Editorial guidance, not a quote from a named person.