An HVAC spare parts list is useful when it is a live register, not a spreadsheet that goes stale. Oxmaint's Parts page lists each part with its part number, description, category, location, on hand, minimum and status, with cards for parts in stock, low, out and to order. The facilities starter set groups parts into six categories, HVAC, Plumbing, Electrical, Fire and safety, Doors and hardware and Consumables. Each part also carries a unit cost and a value, so the list shows what is held. Sign up to open the Parts catalogue on the sample site.

Spare parts · Categories · Minimum

HVAC Spare Parts List by Category

Parts by category with a minimum and a status. Sign up and open the Parts catalogue.

An HVAC Spare Parts List by Category

The starter set holds 28 parts, each with a category, a unit and a reorder point. HVAC parts are the biggest group. They include pleated filters, V-belts, a condenser fan motor, a run capacitor and a programmable thermostat, and the other categories hold what a building team reaches for most.

Oxmaint Parts catalogue on the sample site with the stock cards and a part list with category, location, on hand and minimum

Sample site records from the Oxmaint portal, captured 28 Nov 2026. Your own parts will differ.

CategoryExamples from the starter set
HVACPleated filters, V-belt, condenser fan motor, run capacitor, thermostat
PlumbingT&P relief valve, flush valve repair kit, toilet fill valve, faucet cartridge, water heater anode rod, drain snake cable
ElectricalLED lamps and tubes, photocell, GFCI outlet, contactor
Fire and safetySmoke alarm, fire alarm battery, fire extinguisher, emergency light battery pack
Doors and hardwareDoor closer, mortise lock cylinder, panic bar exit device
ConsumablesDisinfectant cleaner, silicone caulk, trash bags

What Each Part Records

Each part carries a part number, a description, a category, a location and bin, the quantity on hand, a minimum, a unit such as each, pack, kit, gallon or case, and a unit cost. Status is worked out from on hand and the minimum, so a part reads In Stock, Low Stock or Out of Stock without anyone typing it.

Spare parts grouped into the categories HVAC, Plumbing, Electrical, Fire and safety, Doors and hardware and Consumables

Illustrative example, not sample site data.

Cards That Tell You What to Do

The Parts page opens with cards for Parts, In stock, Low stock, Out of stock, To order and Short for open jobs. To order leads to Demand Parts and Short for open jobs leads to Parts Readiness, so the catalogue links to the action. Filters narrow by status and category, and a search box finds a part number, description, bin or vendor.

Open the Parts Catalogue on the Sample Site

Filter by category and open a part. Sign up to the micro app and try it.

Parts Against Jobs

A part's page shows the open jobs that need it and its recent movements, so you can see whether a part is short for work already planned. Adjust books a stock correction. A part with nothing on hand and no minimum is listed as Not stocked, so a catalogue can hold parts you only order when needed.

Part record showing part number, category, location, on hand, minimum and status

Illustrative example, not sample site data.

Your parts, not the starter list

The six categories and 28 parts are the starter set, so a new account is not an empty screen. Replace them with the parts you keep, using the Add part button or an import.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Build the list from what you actually replace. Start with filters, belts, capacitors and the fuses and contactors for your rooftop units, record the size or model in the description, and set a minimum from how long a supplier takes to deliver. Review the Low stock card each week. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

How are the parts grouped?
By category. The starter set uses HVAC, Plumbing, Electrical, Fire and safety, Doors and hardware and Consumables, and the Parts page filters by category. Sign up to filter parts.
What does a part record?
Part number, description, category, location and bin, on hand, minimum, unit, unit cost and a status worked out from on hand and the minimum. Sign up to open a part.
What do In Stock, Low Stock and Out of Stock mean?
They are worked out from on hand against the minimum: below the minimum is Low Stock, and nothing on hand is Out of Stock. Sign up to see the cards.
Can I see which jobs need a part?
Yes. A part's page lists the open jobs that need it, and the Short for open jobs card leads to Parts Readiness. Sign up to open a part.
Can I import my own list?
Yes. Parts can be added one at a time with Add part, and the Import my data option brings in a list. Sign up to see the import.
Is it a PDF list?
No. It is a live register on screen that can be searched and filtered, so it stays current as stock moves. Sign up to see the register.