CMMS for Process, Chemical and Oil & Gas Sites

By William Jerry on November 28, 2026

cmms-for-process-chemical-and-oil-gas-sites

On a process site the equipment rarely stops on its own schedule, and the work around it needs a permit before anyone opens a flange. Oxmaint's Process, Chemicals & Oil/Gas setup arranges the site as areas and units, registers pumps, compressors, exchangers, reactors and boilers, and adds operator rounds done and safety PM on time to the dashboard. Permits, lockout, incidents, lubrication, the logbook and root-cause analysis sit on the same records. Sign up to try the micro app and choose the process setup.

Process · Chemicals · Oil & Gas · Rounds · Permits

CMMS for Process, Chemical and Oil & Gas Sites

Units, rounds and safety PMs on one set of records. Sign up and explore the process setup.

A Sample Chemical Site, Area by Area

The starting site is Cypress Bay Chemical Site in Deer Park, Texas, arranged as site, area and unit, with equipment placed in the unit it serves. Sign up to walk it.

01
Utilities

Steam generation: boiler, steam trap station, pressure transmitter. Air supply: two air compressors and a transmitter.

02
Reaction

Batch Reactor 1: reactor vessel, agitator, control valve and flow meter.

03
Transfer

Feed pumping: process pump, flow meter and pressure transmitter.

04
Cooling

Heat exchange: shell and tube exchanger, cooling tower and control valve.

Sample plant records from the starting content of the portal's Process, Chemicals & Oil/Gas setup, not a named site.

Indicators for a Process Site

IndicatorHow it is countedTarget
Operator rounds donePoints read on operator rounds in the period as a share of the points on those rounds95%
Safety PM on timePreventive jobs on safety equipment (relief valves, interlocks, gas detection, guards) due in the period and done on or before the due date100%
AvailabilityRun time as a share of planned production time90%
Bad actorsEquipment with two or more unplanned stops in the period; the top five are listed-
MTBF / MTTRRun time per unplanned stop / mean duration of unplanned stops closed in the period-
Technician checking a centrifugal pump with a vibration pen

Choose the Process Setup

See the areas and units, the round indicators and the starting PM programmes. Sign up to the micro app and explore.

Rounds, Read Point by Point

A round is a route of readings. Each point has its limit, and a reading outside it is flagged on the round. This is how one round on the base sample plant read on 26 November 2026.

Compressor house round · 28 points · 17 read (62%)
Discharge pressureOutside limit
Oil levelOutside limit
Bearing temperature, drive endOutside limit
Vibration, horizontalOutside limit
Remaining points11 not read yet

Sample plant records from the Oxmaint portal's Logbook Routes, captured 26 Nov 2026. Rounds done counts read points against points on the round.

The process setup starts with six rounds: Critical Rotating Equipment Check, Heat Exchanger Fouling Inspection, Boiler and Steam System Walk, Reactor and Agitator Check, Storage Tank and Valve Survey, and Instrument and Calibration Audit.

Starting PM Programmes

Centrifugal pump mechanical seal inspectionPumps3 months
Air compressor lubrication and filter checkCompressorsWeekly
Process compressor vibration analysisCompressors500 h
Steam boiler water treatment dosing checkBoilerWeekly
Heat exchanger tube bundle leak testExchangers12 months
Reactor agitator seal and bearing inspectionReactor6 months
Control valve packing and actuator checkValves6 months
Pressure transmitter calibrationInstruments12 months
Operator on a round reading a gauge at a heat exchanger
Permits and lockout on the same job

When a job or its equipment has a permit, a lockout procedure or a safety checklist, starting the work asks "Safety steps done?" first. Incidents and root-cause analysis are recorded on the same equipment record.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Treat safety PM on time as a target of 100 percent, and read it separately from the overall PM figure so a good month on routine lubrication cannot hide a late relief valve. On rounds, a missed point is a finding too: ask why it was not read before asking why a reading was high. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

What changes when I choose the process setup?
The site is arranged as areas and units, equipment such as pumps, exchangers and reactors is registered, and permits, lockout, incidents, lubrication, logbook and root-cause analysis are on. Sign up to choose it.
What does safety PM on time include?
Preventive jobs on safety equipment such as relief valves, interlocks, gas detection and guards, due in the period and completed on or before the due date. The target is 100 percent. Sign up to read it.
How are operator rounds counted?
Rounds done is the points read on rounds in the period as a share of the points on those rounds. Readings outside a limit are flagged on the round. Sign up to open a round.
Can a PM run on hours for a compressor?
Yes. The starting process compressor vibration analysis runs every 500 hours, and others run weekly, every 3, 6 or 12 months. You can change any of them. Sign up to see the programmes.
Does Oxmaint make a site compliant with process safety rules?
No software can promise that. It keeps permits, lockout, safety PMs and incidents on the same records, but your own procedures and local rules still apply. Sign up to explore.
Can I try this without setting anything up?
Yes. Choose the process setup and explore the sample site. When you are ready, send your equipment list, parts and PM schedules and they are loaded in place of the starting records. Sign In to Access Micro App

Maintenance for Sites That Run Around the Clock

Units, rounds, permits and safety PMs in one portal. Sign up and explore the process setup.


Share This Story, Choose Your Platform!