In a discrete plant, a stopped CNC cell or a press waiting for a die change shows up straight away in parts not made. Oxmaint's Discrete & Automotive setup names the plant in CNC, stamping, welding, robot cell and assembly terms, and puts ten line indicators on the dashboard: OEE, availability, unplanned downtime, MTBF, MTTR, PM on time, top downtime reason, critical spares short, changeover time and downtime cost. Sign up to try the micro app and see the indicators on real sample records.
CMMS for Discrete Manufacturing and Assembly
CNC, stamping, welding and assembly lines, with the numbers a plant manager asks for. Sign up and explore the discrete setup.
Thirty Days on the Sample Plant
The portal's sample metal fabrication and assembly plant already runs these indicators. This is how its last 30 days read on 26 November 2026. Sign up to open Plants & Lines.
Sample plant records from the Oxmaint portal, captured 26 Nov 2026, last 30 days: 120.5 h unplanned downtime of 3,638.9 h planned, over 152 stops; 8 bad actors, led by CNC Machining Center 03 with 11 stops; 7 critical spares short, 2 of them out of stock; PM on time 20% (2 of 10 due). Your numbers will differ.
Ten Indicators, Each With Its Definition
| Indicator | What it counts |
|---|---|
| OEE | Availability x performance x quality, shown only where production counts exist |
| Availability | Run time as a share of planned production time |
| Unplanned downtime | Hours the lines stopped without a plan |
| MTBF | Run time divided by the number of unplanned stops |
| MTTR | Mean duration of the unplanned stops closed in the period |
| PM on time | Preventive jobs due in the period done on or before the due date |
| Top downtime reason | The reason that cost the most stopped hours, every reason ranked |
| Critical spares short | Parts that fit machines on the lines and are below minimum or out, as of now |
| Changeover time | Hours spent changing lines from one product or setup to the next |
| Downtime cost | Unplanned downtime hours times each line's cost per hour |
See the Line Indicators
Open Plants & Lines on the sample plant and click through to the stops behind each number. Sign up to the micro app and look.
The Discrete Setup's Starting Plant
Choose the discrete setup and the starting plant is Ironwood Plant in Lansing, Michigan, with four areas and their cells and lines.
Sample plant records from the starting content of the portal's Discrete & Automotive setup.
Starting PM Programmes
Plants & Lines shows MTTR 0.8 h for line stops closed in the last 30 days. The overview tile shows 9.3 h, the mean wrench time across all work orders. They measure different things, so compare like with like.
Start with stops, not spreadsheets. Log every unplanned stop against its line with a reason, and the discrete indicators fill themselves in. Then look at bad actors and changeover time together: a machine with many short stops and long changeovers is usually where a small PM or setup change pays back fastest. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Line Numbers You Can Trace Back to a Stop
OEE, changeovers and critical spares for discrete plants. Sign up and explore the sample plant.