CMMS for Discrete Manufacturing and Assembly

By William Jerry on November 28, 2026

cmms-for-discrete-manufacturing-and-assembly-1

In a discrete plant, a stopped CNC cell or a press waiting for a die change shows up straight away in parts not made. Oxmaint's Discrete & Automotive setup names the plant in CNC, stamping, welding, robot cell and assembly terms, and puts ten line indicators on the dashboard: OEE, availability, unplanned downtime, MTBF, MTTR, PM on time, top downtime reason, critical spares short, changeover time and downtime cost. Sign up to try the micro app and see the indicators on real sample records.

Discrete & Automotive · OEE · Changeovers · Spares

CMMS for Discrete Manufacturing and Assembly

CNC, stamping, welding and assembly lines, with the numbers a plant manager asks for. Sign up and explore the discrete setup.

Thirty Days on the Sample Plant

The portal's sample metal fabrication and assembly plant already runs these indicators. This is how its last 30 days read on 26 November 2026. Sign up to open Plants & Lines.

96.7%
Availability
87.9%
OEE
23.1 h
MTBF
0.8 h
MTTR
$193,463
Downtime cost
OEE broken down, last 30 days
Availability96.7%
Performance92.9%
Quality97.7%

Sample plant records from the Oxmaint portal, captured 26 Nov 2026, last 30 days: 120.5 h unplanned downtime of 3,638.9 h planned, over 152 stops; 8 bad actors, led by CNC Machining Center 03 with 11 stops; 7 critical spares short, 2 of them out of stock; PM on time 20% (2 of 10 due). Your numbers will differ.

Ten Indicators, Each With Its Definition

IndicatorWhat it counts
OEEAvailability x performance x quality, shown only where production counts exist
AvailabilityRun time as a share of planned production time
Unplanned downtimeHours the lines stopped without a plan
MTBFRun time divided by the number of unplanned stops
MTTRMean duration of the unplanned stops closed in the period
PM on timePreventive jobs due in the period done on or before the due date
Top downtime reasonThe reason that cost the most stopped hours, every reason ranked
Critical spares shortParts that fit machines on the lines and are below minimum or out, as of now
Changeover timeHours spent changing lines from one product or setup to the next
Downtime costUnplanned downtime hours times each line's cost per hour
Technician replacing a torch part on a robotic welding cell

See the Line Indicators

Open Plants & Lines on the sample plant and click through to the stops behind each number. Sign up to the micro app and look.

The Discrete Setup's Starting Plant

Choose the discrete setup and the starting plant is Ironwood Plant in Lansing, Michigan, with four areas and their cells and lines.

Machining2 cells
CNC Cell 1
2 machining centres, 1 lathe
CNC Cell 2
1 machining centre, 2 lathes
Stamping2 lines
Press Line 1
2 mechanical presses, 1 hydraulic press
Forming Line 1
Hydraulic press, 2 press brakes
Welding2 cells
Weld Cell 1
3 welding robots
Weld Cell 2
2 welding machines, 1 robot
Assembly2 lines
Assembly Line 1
Robots and conveyors
Test Cell 1
Vision inspection, compressor

Sample plant records from the starting content of the portal's Discrete & Automotive setup.

Starting PM Programmes

CNC spindle and way lubrication checkCNC cellsWeekly
Mechanical press safety guard inspectionPress linesMonthly
Welding robot end effector calibrationWeld cells3 months
Conveyor belt tension and alignment checkAssemblyWeekly
Vision inspection system lens cleaningTest cellWeekly
Hydraulic press brake ram alignment checkForming3 months
Operator using a torque tool at an assembly station
Two MTTR figures on the sample plant

Plants & Lines shows MTTR 0.8 h for line stops closed in the last 30 days. The overview tile shows 9.3 h, the mean wrench time across all work orders. They measure different things, so compare like with like.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Start with stops, not spreadsheets. Log every unplanned stop against its line with a reason, and the discrete indicators fill themselves in. Then look at bad actors and changeover time together: a machine with many short stops and long changeovers is usually where a small PM or setup change pays back fastest. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

Which indicators does the discrete setup show?
OEE, availability, unplanned downtime, MTBF, MTTR, PM on time, top downtime reason, critical spares short, changeover time and downtime cost, each with its definition. Sign up to see them.
How is OEE worked out?
Availability times performance times quality, from the line's own downtime and production counts. Where no production counts exist, OEE is not shown rather than guessed. Sign up and open a line.
What counts as changeover time?
Hours spent changing a line over from one product or setup to the next in the period, planned or not, taken from the stops logged as changeovers. Sign up to read the definition.
Do PMs still run on run hours in this setup?
Yes. PM schedules can run on hours, dates or both, and daily checks, Parts Readiness and the Kanban board are the same as in the base plant. Sign up to open the PM register.
What is a bad actor?
A machine with two or more unplanned stops in the period. The five with the most stops are listed; on the sample plant CNC Machining Center 03 led with 11. Sign up to see the list.
Can I try this without setting anything up?
Yes. Explore the sample plant, then choose the discrete setup. When you are ready, send your asset list, parts and PM schedules and they are loaded in place of the starting records. Sign In to Access Micro App

Line Numbers You Can Trace Back to a Stop

OEE, changeovers and critical spares for discrete plants. Sign up and explore the sample plant.


Share This Story, Choose Your Platform!