LOTO Procedure Management Software

By William Jerry on November 27, 2026

loto-procedure-management-software-hero-1

Lockout/tagout only protects people when the right steps are written down for the right machine and followed before the work starts. Oxmaint AI keeps each LOTO procedure as a record on the asset it belongs to: the energy sources, the isolation points, the steps and the try-out, with a review and approval status. When a job is started on a machine that has a procedure, the technician is asked to apply it and complete its checklist first. Sign up to try the micro app and open a sample plant with nine procedures already in the register.

LOTO Procedures · Work Orders · EHS · Audit Trail

LOTO Procedure Management Software

Keep asset-specific lockout/tagout procedures with review and approval, next to work permits, safety clearances and work orders. Sign up and open a sample plant with nine procedures already in the register.

What One Procedure Record Holds

Each procedure is attached to one asset. It lists the energy sources to isolate, how many isolation points there are, and the written steps. From those, Oxmaint builds the checklist a job walks before work starts: isolate each source, release stored energy, then try to start the machine to prove it is dead. The record below is an invented example in the same shape. Sign up to open the real ones.

Hydraulic press (example)Approved
2
Energy sources
2
Isolation points
4
Checklist steps
The checklist a job walks before work starts
1IsolateIsolate electrical supply at its isolation point; fit your lock and tag
2IsolateIsolate hydraulic pressure at its isolation point; fit your lock and tag
3ReleaseRelease or block any stored energy (pressure, springs, capacitors, gravity)
4Try-outAttempt to start the equipment and confirm it does not move or energise

Illustrative example, not real data. Your own procedures can carry their own written steps and a verification note.

The Gate Before In Progress

A procedure is no use sitting in a folder. In Oxmaint it sits on the asset, so a work order for that machine carries a Lockout / tagout line: Required before work starts, with the number of steps done out of the total. Choose Apply LOTO and the checklist opens as a set of tick boxes, and each tick records who did it and when.

AssignedJob is ready to start

Apply LOTOEvery checklist step ticked on the work order

In ProgressWork can begin
If someone tries to start the job early, the portal answers: Apply LOTO on the work order and complete its checklist before work starts.

Put the Procedure in Front of the Job

Look through the procedures on a sample plant and see where they meet the work order. Sign up to the micro app and open the LOTOTO tab.

From Under Review to Approved

A procedure should be checked by someone senior before the crew relies on it. Oxmaint treats it as a record with a status, not a loose document.

Under ReviewA new procedure starts here. It needs an asset, at least one energy source and the isolation steps before it can be saved.
ApprovedA user with approver rights marks it Approved. The portal then records who verified it and the date, shown as Verified by and Last verified.
Audit TrailChanges to a LOTO procedure appear in the Audit Trail with the rest of the portal's activity, and can be filtered by the LOTO Procedure record type.

Locks and Tags, Counted Before the Job

A procedure also knows how much hardware it needs. Each isolation point takes a padlock and a danger tag, and a crew's locks go on one group hasp. Oxmaint reads your parts register for matching lockout parts and shows what is needed against what is on hand, so a short lock box is found before the job, not at the isolator. A procedure with four isolation points, like the sample plant's Belt Conveyor 02, needs the following.

4
Padlocks
One for each isolation point
1
Group hasp
Holds the crew's locks together
1
Pack of danger tags
One pack covers a procedure

A line appears only for lockout parts your stores register actually holds, and turns to a shortage warning when stock on hand is below what the procedure needs.

Lockout hasp with several padlocks and danger tags on a conveyor isolator switch in daylight

The Sample Plant's LOTOTO Register

The portal opens on a sample metal fabrication plant, and its EHS section already holds a register of procedures on the LOTOTO tab. It is there so you can see how a full register reads before you add your own. Sign up to explore the sample plant.

portal.oxmaint.ai · EHS · LOTOTO
9
Procedures
9
Approved
0
Under review
23
Isolation points
10
Energy sources
AssetEnergyPointsSteps
Overhead Crane 01Sample · Approved127
CNC Lathe 02Sample · Approved127
Hydraulic Press Brake 01Sample · Approved1311
Belt Conveyor 02Sample · Approved1413
Forklift 03Sample · Approved2414

Sample plant records from the Oxmaint portal, captured 26 Nov 2026. Five of the nine procedures are shown. Your numbers will differ.

Procedure, Permit or Clearance?

The EHS section keeps three records that are easy to mix up. Each answers a different question, and they sit side by side so a job can carry more than one. Sign up to see them together.

RecordQuestion it answersHow it moves
LOTO procedureHow is this machine isolated, step by step?Under Review, then Approved
Work permitHas permission to do this work been given?Shown on the job as a safety step
Safety clearanceIs the plant isolated and handed over for work?Requested, Approved, Active, Closed
Supervisor and technician reviewing a laminated lockout procedure sheet beside a metal press in daylight
What the software does not do

Oxmaint records the procedure, gates the job and keeps the evidence. It does not lock anything. The padlock goes on the isolator, by authorised people who are trained for it, and your own safety rules and local regulations still apply.

Expert Review
Reviewed by the Oxmaint AI maintenance team

A procedure helps most when it is specific. Start with the machines that have more than one energy source, such as a hydraulic press or a forklift with a battery, and write the isolation points the way the crew would say them. Review each procedure on a set rhythm, and check the lock box count before the job. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

What does a LOTO procedure in Oxmaint contain?
It is attached to one asset and lists the energy sources, the isolation points, the written isolation steps and an Under Review or Approved status. The job checklist built from it also covers releasing stored energy and a try-out. Sign up to open a procedure.
Does Oxmaint stop a job from starting until LOTO is done?
On a job whose asset has a procedure, the portal asks you to apply LOTO on the work order and complete its checklist before the job can start. The checklist is a record; the physical lock is still fitted by your authorised people. Sign up and try the gate.
Who approves a procedure?
A new procedure starts as Under Review. A user with approver rights marks it Approved, and the portal records who verified it and when. Other users can read it and walk its checklist on a job. Sign up to look at the approval step.
Can I see who ticked each step?
Yes. Each tick on the Apply LOTO checklist records the person and the time, and the job shows when the whole checklist was completed. Changes to the procedure itself appear in the Audit Trail. Sign up and open a work order.
How does Oxmaint know how many locks I need?
It counts one padlock for each isolation point, one group hasp and a pack of danger tags, then compares that with matching parts in your stores register. If you stock none of them, no lock lines are shown. Sign up to see the lockout kit.
Can I try this without setting anything up?
Yes. The portal starts with a ready-made plant, so you can look at the records straight away. When you are ready, add your own machines under Assets, or send your asset list, parts and stock, PM schedules and work order history (an export from your current CMMS or a spreadsheet is enough) and they are loaded in place of the starting records. Sign In to Access Micro App

Procedures, Permits and Clearances in One Place

LOTO procedures, work permits, safety clearances and work orders in one portal. Sign up, explore the sample plant, and add your own procedures when you are ready.


Share This Story, Choose Your Platform!