Maintenance Audit Trail & Audits | Oxmaint CMMS

By William Jerry on November 28, 2026

maintenance-audit-trail-audits

When an auditor asks who changed a due date or closed a job, the answer should take one search, not a week of emails. Oxmaint's Audit Trail keeps every change in the portal: who made it, when, on which record, and the value before and after, exportable to CSV or Excel. Beside it, Audits are the walks your team does with a checklist, scored, with failed lines raising work orders. Sign up to open a sample audit trail with 44 changes in the last week.

Audit Trail · Audits · Export · Before and After

Maintenance Audit Trail & Audits

Every change on record, and every walk scored. Sign up and search a sample trail.

The Audit Trail, on the Sample Plant

25
Changes today
44
Last 7 days
9
People
40
Records changed
2
Deletions

Sample plant records from the Oxmaint portal's Audit Trail, captured 26 Nov 2026.

What Each Line Records

ColumnWhat it shows
WhenDate and time of the change
WhoThe person signed in, or the name given where there is no sign-in
WhatThe record: a work order, asset, part, setting and so on
ActionCreated, updated, status changed, approved, deleted or exported
ChangedEach field with its value before and after, such as Open to In Progress

Filter by person, kind of record, action and date range, then export the lines to CSV or Excel for the auditor. Sign up to filter the trail.

Auditor checking records on a laptop in a plant office

Search a Sample Audit Trail

Filter by person or record and export the lines to CSV or Excel. Sign up to the micro app and try it.

Changes From a QR Label Too

No sign-in, still on the trail

Requests and checks sent from a QR label, without a sign-in, are marked as coming from the label and land in the same audit trail as everything else.

Audits Your Team Walks

An audit is a walk through an area against a checklist. Each line is passed or failed, the walk gets a score, and failed lines raise work orders.

3
Audits
1
In progress
3
Open findings
71%
Average score
Sample audits by score
AUD-0001 Monthly safety walk, Production hall75%
AUD-0002 5S audit, Line 2 cell67%

Sample plant records from the Oxmaint portal's Audits, captured 26 Nov 2026. AUD-0001 by Laura Chen on 20 Nov, 2 findings, completed; AUD-0002 by Tyler Brooks on 26 Nov, 1 finding, in progress; AUD-0003 fire-door audit, Warehouse and offices, Carlos Ramirez, 03 Dec, draft. Open findings are failed lines with no work order yet.

Supervisor scoring a tidy workbench during a shop-floor audit
Audit Trail

Every change in the portal

Kept automatically

Who, when, before and after

Export CSV or Excel

Audits

A walk your team does

Started from a checklist

Scored, with findings

Failed lines raise work orders

Expert Review
Reviewed by the Oxmaint AI maintenance team

Read the trail for patterns, not only for blame. A due date moved three times, or a job closed by the same person who did it, tells you where the process is soft. Keep audit findings moving: an open finding with no work order is the one an auditor will ask about first. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

What does the audit trail record?
Every change in the portal: who made it, when, on which record, the action, and each field's value before and after. Sign up to see it.
Can I export the audit trail?
Yes. Filter by person, kind of record, action and date range, then export to CSV or Excel. Sign up and export.
Are changes from QR labels included?
Yes. Requests and checks sent from a QR label without a sign-in are marked as coming from the label and land in the same trail. Sign up to scan a label.
What is the difference between the audit trail and audits?
The trail is the automatic record of every change. Audits are walks your team does against a checklist, with a score and findings. Sign up to compare.
What happens to a failed audit line?
It becomes a finding and can raise a work order. Findings with no work order yet are counted as open findings. Sign up to walk an audit.
Are deletions recorded?
Yes. Deleting a record is an action on the trail like any other; the sample trail shows 2 deletions. Sign In to Access Micro App

Answer Every Who-Changed-What Question

An audit trail for every change, and audits that raise work. Sign up and explore the micro app.


Share This Story, Choose Your Platform!