Work only gets done when it is on a named person's list. Oxmaint keeps the people who use the portal as members with a role and a trade, groups them into teams with a lead, and assigns each work order to a person, which is what puts the job in their My Tasks and in the board's Assigned column. Each technician can have a labour rate, or time is priced at the company default. Sign up to see sample teams carrying 75 open jobs.
Maintenance Teams, Roles & Members
Who does the work, in which crew, at what rate. Sign up and see two sample teams.
Two Sample Teams
Sample plant records from the Oxmaint portal's Teams, captured 26 Nov 2026: 2 teams, 8 people, 75 open, 17 overdue.
Roles and Trades
| Role | Typical work in the portal |
|---|---|
| Administrator | Sets up the organisation, sites and settings |
| Supervisor | Leads a team, assigns work and checks it |
| Planner | Plans PMs, parts and the week's work |
| Technician | Does the jobs on their list and books time |
Members also carry a trade, such as Mechanical or Electrical, and each member's open, overdue and completed work and hours are shown beside their name. Sign up to see members.
See the Sample Teams
Open a team, check its workload and assign a job to one of its people. Sign up to the micro app and try it.
From Assignment to Someone's List
One Technician's Workload
Sample plant records from Members, captured 26 Nov 2026.
Labour Rates
A rate a manager types on a time entry.
Otherwise, the technician's own rate.
Otherwise, the default in Settings.
Shown as Set a rate, never as $0.
A job can also be assigned to a vendor or contractor instead of a member, so outside work sits on the same board.
Assign every job to one person, even when a crew does it. A job owned by a team is owned by nobody. Read open and overdue by team weekly: a team with three times the overdue work of another usually needs a planning change, not more pressure. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Put Every Job on a Named Person's List
Members, teams, roles and rates beside the work. Sign up and explore the micro app.







