Parts tells you what a spare is; Stocks tells you how many sit where and what they are worth. Oxmaint's Stocks screen shows the live on-hand position of each part at the site that holds it, with its reorder point, its cover and its value at cost, and books issues, receipts and transfers as movements on one ledger, with a reason and a reference on each. Sign up to open the sample storeroom with 70 stock lines and $58,180 held across two sites.
Storeroom Stock Management for Maintenance
How much sits where, what it is worth, and what has moved. Sign up and open the sample storeroom.
The Sample Storeroom
Sample plant records from the Oxmaint portal's Stocks, captured 26 Nov 2026: 7 movements booked (issues and receipts). Valuation is stock at cost, not replacement.
Value by Site
Value by Category
Sample plant records, captured 26 Nov 2026.
Open the Sample Storeroom
See stock by site and category, cover against reorder points, and book a movement. Sign up to the micro app and try it.
Reading a Stock Line
Sample plant record from Stocks, captured 26 Nov 2026. Cover is on hand as a share of the reorder level.
| Column | What it tells you |
|---|---|
| Location and aisle | Where the part is kept in the store |
| On hand | The live quantity from the ledger |
| Reorder at | The level at which the part should be ordered |
| Cover | On hand against the reorder level |
| Value | On hand times unit cost |
Booking a Movement
From the stock line, open Adjust.
Pick a reason, such as issued to work order or goods received.
Name the job or the order it belongs to.
On hand, status and value update together.
Because every number comes from the same ledger, on hand, status, cover and value never disagree between the Stocks screen, the Parts register and the jobs that use the parts.
Stock moved from one site to another is booked as transferred out and transferred in, so each site's figures stay right and one plant's order never quietly tops up another's store.
Count the fast movers monthly and the rest twice a year, and book every difference as a stock count correction rather than overwriting the number. The corrections themselves tell you where the store process is leaking. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Know What Is in the Store, and Where
Stock by site, reorder points and a ledger of every movement. Sign up and explore the micro app.







