How to Create a Maintenance Work Order

By William Jerry on November 28, 2026

how-to-create-a-maintenance-work-order

Creating a work order takes a minute when the form asks only for what a job needs to start. In Oxmaint you open Work Orders, choose Create, pick the asset the work is on, and fill a short form: title, site, priority, who is doing it and the due date. Everything else, from the task list to parts, labour and costs, folds under More details and can be added before you submit. Sign up to create a work order on a sample plant.

How-To · Work Orders · The Job Form

How to Create a Maintenance Work Order

From a blank form to a job on someone's list, step by step. Sign up and raise a job on a sample asset.

The Short Form: What a Job Needs to Start

Step 1
Title

What is wrong or what is planned, in a line the technician will understand.

Step 2
Site and asset

The machine the work is on, plus any others it also affects.

Step 3
Priority

Critical, High, Medium or Low. The due date follows: 1, 3, 7 or 14 days.

Step 4
Assign to

An internal technician, or a vendor or contractor.

Step 5
Due date

Filled in from the priority; change it if the job has a real deadline.

An Example Job

portal.oxmaint.ai · Work Orders · Create work order
Compressor oil leak at the separator housingCorrective
Asset
Screw Air Compressor 01
Priority
High, due in 3 days
Assign to
Jake Sullivan
Parts
Compressor air/oil separator x 1
Estimated
2 h

Illustrative example on a real sample-plant asset and technician; not a captured record.

Technician photographing an oil leak under a machine with a phone

Raise a Job on a Sample Asset

Open the job form, pick a machine and create a work order in a minute. Sign up to the micro app and try it.

More Details, When the Job Needs Them

SectionWhat you can add
Type and descriptionCorrective, preventive, inspection or breakdown, and the detail
Task listSteps with the trade and the hours for each
Parts and materialsParts and quantities; parts named in the description are suggested
Attachments and labourPhotos, documents and planned labour
Remarks and notesNotes for the technician, a handover note, and an update to the requester
Linked work ordersA parent job, or links such as follows on from, blocks, duplicates or same shutdown
Costs and budgetEstimated cost, cost centre and budget code

Not ready to send it? Save draft keeps it off the board until you finish. Create work order puts it live on the work order list and the Kanban board.

Other Ways a Work Order Gets Created

01
From a request

Approve a maintenance request and it becomes a corrective job on the same asset.

02
From a PM schedule

A due PM raises a preventive job with the schedule's tasks and parts.

03
From a failed check

A failed item on a daily check, inspection or audit can raise a job.

Supervisor handing a job to a technician on the shop floor
Expert Review
Reviewed by the Oxmaint AI maintenance team

Write the title as the symptom on the machine, not the fix you expect: "oil leak at separator housing" is better than "replace separator". List the parts before you assign, so the board shows straight away whether the job can start or will wait for stock. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

What is the minimum a work order needs?
A title, the site and asset, a priority, who is doing it and a due date. Everything else can be added under More details before you submit. Sign up to try the form.
How is the due date set?
From the priority: Critical 1 day, High 3, Medium 7, Low 14. You can change it when the job has a real deadline. Sign up and raise a job.
Can I assign a job to a contractor?
Yes. Assign to offers an internal technician or a vendor or contractor, so the job reads as theirs from the start. Sign up to see the options.
Can one job cover several machines?
Yes. Pick the related asset, then add the others it also affects, so the job shows in each machine's history. Sign up and add assets to a job.
Can I save a work order without sending it?
Yes. Save draft keeps it off the board until you are ready, and Create work order puts it live. Sign up to save a draft.
Where does the job appear after I create it?
In the work order list, on the Kanban board in its status column, and in the assigned technician's My Tasks. Sign In to Access Micro App

Create Your First Work Order

A short form for what a job needs, more details when it needs them. Sign up and explore the micro app.