A work order that does not carry its cost leaves the maintenance budget to guesswork. In Oxmaint each job carries three kinds of cost: technician time at a labour rate, parts issued to the job, and other costs such as a contractor, travel or rental. The job's total is the sum of what has been booked, and the same total is what reports, the dashboard and the exports read. Sign up to see job costs on a sample plant with $45,576 booked.
Work Order Cost Tracking: Labor, Parts & Other
Time at a rate, parts issued and other costs, on the job they belong to. Sign up and open a costed sample job.
Three Cost Lines on Every Job
Hours booked by in-house technicians or contractors, priced at a rate.
Parts issued from stock to the job, at their unit cost.
Contractor, travel, rental or other costs added on the job.
Sample Jobs and Their Costs
Sample plant records from the Oxmaint portal's Work Orders, captured 26 Nov 2026.
Open a Costed Sample Job
See time, parts and other costs on a job, and how they add up to its total. Sign up to the micro app and look.
Which Labour Rate Is Used
When a manager types a rate on the time entry.
Otherwise, the technician's own hourly rate.
Otherwise, the default labour rate set under Settings.
The screen says Set a rate, rather than showing $0 or a made-up figure.
Labour on the Sample Plant
| Technician | Hours | Rate | Labour cost |
|---|---|---|---|
| Carlos Ramirez | 134 h | $29/h | $3,886 |
| Jake Sullivan | 131 h | $29/h | $3,799 |
| Ryan Foster | 111 h | $30/h | $3,330 |
| Tyler Brooks | 63 h | $38/h | $2,394 |
Sample plant records from the Oxmaint portal's Labor page, captured 26 Nov 2026: in-house 537 h, contractor 24 h, labour cost $19,475, contractor share 4%.
Cost per Machine
Sample plant records from the asset page, captured 26 Nov 2026.
Once a job is Closed or Cancelled its costs are locked: a manager confirms before changing them, and a technician cannot.
Book time on the job the day it is worked, not at month end. A cost line booked late is usually a guess. Set the company default rate first so no time is left unpriced, then add personal rates where they differ, and read cost per machine alongside its downtime. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Know What Every Job Cost
Labour, parts and other costs on the work order, the same figure everywhere. Sign up and explore the micro app.