A maintenance request is someone telling you a machine needs attention. It becomes work only when someone reviews it and raises a work order. In Oxmaint, requests wait on the request desk as Pending or In Review; one click on "Approve & raise work order" creates a corrective job on the same asset and carries over its priority, description, due date and photos. Denying takes a reason. Sign up to work a sample request desk with 27 requests on it.
How to Convert a Request to a Work Order
Review, approve and raise, with the request's photos going straight to the job. Sign up and convert a sample request.
The Request Desk, by Status
Sample plant records from the Oxmaint portal's Request Maintenance, captured 26 Nov 2026: 27 requests. Awaiting work order means approved but nothing raised yet.
Converting a Request, Step by Step
Read what is wrong, the asset, the priority and any photos. Example: MR-2026-09001, CNC Machining Center 03 spindle noisy at high rpm, High.
Mark it In Review while you look, or decide straight away.
"Approve & raise work order" creates the job and marks the request Work Order Raised, with the job number on it.
Deny asks for a reason, which is recorded on the request.
Convert a Sample Request
Open a pending request, approve it and see the job it becomes. Sign up to the micro app and try it.
What Carries Over to the Work Order
| From the request | On the new job |
|---|---|
| Title and description | Copied as the job's title and description |
| Asset | The same asset; a request raised on a site keeps the site and no asset |
| Priority | The request's priority |
| Needed-by date | The job's due date |
| Photos | Moved onto the job's Attachments tab, so the technician sees what the requester saw |
| Request number | Recorded as the job's source, with a link back |
The job is raised as corrective. If the job cannot be saved, the request stays where it was rather than being marked converted with nothing behind it.
Requests From a QR Label
No sign-in needed
Asks what is wrong, the detail, up to 3 photos, a name and contact
Marked as coming from the label
From Request Maintenance in the portal
Same fields, tied to the user
Same review, approve and deny path
A request that was approved but never raised looks settled on every other screen while no work exists. The tile counts exactly those, so nothing approved is forgotten.
Decide every request within a shift, even if the answer is In Review. Requesters stop reporting when nothing happens. When you deny, write the reason as you would say it to the operator, because that note is what they will read. Editorial guidance, not a quote from a named person.
Frequently Asked Questions