A work order is the record of one maintenance job: the machine it is on, what is wrong or what is planned, who is doing it, the parts and time it takes, and what was actually done. Every repair, planned service and inspection a maintenance team does should have one, because it is the only place the history of a machine gets written down. This guide explains the parts of a work order and how one moves from raised to closed in a CMMS. Sign up to open a sample work order on a sample plant.

Definitions · Work Orders · Maintenance Basics

What Is a Work Order in Maintenance?

What goes on a work order, the statuses it moves through and why the record matters. Sign up and open a real sample job.

A Work Order in One Line

Definition

A work order is the written instruction and the record of a single maintenance job on an asset: what to do, who does it, with which parts and time, and what was done when it finished.

What Goes on a Work Order

PartWhat it holds
Title and descriptionWhat is wrong, or what the planned job is
TypeCorrective, preventive, inspection or breakdown
PriorityCritical, high, medium or low; the due date follows from it
AssetThe machine the work is on, plus any others it also affects
Assigned toA technician or an outside vendor or contractor
Tasks and partsThe steps, the trade for each, and the parts the job needs
Time and costEstimated hours, then the hours, parts and costs actually booked
Close-outA summary of the work done, the cause and whether a follow-up is needed

A Real Sample Record

WO-2601 · Screw compressor 2,000 h serviceIn Progress
Type
Preventive
Priority
High
Estimated
4 h, estimate $525
Tabs
Overview, Asset Info, Tasks, Comments, Attachments, Time, Materials, Costs, Children, History

Sample plant records from the Oxmaint portal, captured 26 Nov 2026. Sign up to open it.

Technician reading job instructions on a phone before starting a repair

Open a Sample Work Order

See the tabs, the parts panel and the history on a real sample job. Sign up to the micro app and look.

The Statuses a Work Order Moves Through

A job moves forward one stage at a time, and each move asks for the one thing the next stage needs. These are the stages in Oxmaint and what each asks.

Status 1
Open

Raised, with nobody on it yet.

Status 2
Assigned

Who is doing the job; the due date fills in from the priority (Critical 1 day, High 3, Medium 7, Low 14).

Status 3
In Progress

A start note, and "Safety steps done?" where a permit, lockout or safety checklist applies.

Status 4
On Hold

Why it is waiting: parts, a production stop window, another trade or an approval, with an expected date.

Status 5
Completed

A summary of the work done, with time, downtime, parts used and the cause.

Status 6
Closed

An optional check note and who checked. Only a manager or admin can reopen a closed job.

Four Types, One Kind of Record

Preventive, corrective, breakdown and inspection jobs are all work orders. They differ by type, not by living in a different system, so one asset history shows them all.

Sample plant work orders by type
64
40
20
16
CorrectivePreventiveBreakdownInspection

Sample plant records from the Oxmaint portal's Reports, captured 26 Nov 2026: 140 work orders in total.

Spare parts and hand tools laid out on a bench ready for a job

Why the Record Matters

01
History

What was done to a machine, when and by whom, in one place rather than in notebooks.

02
Cost

Hours, parts and outside costs booked on the job they belong to.

03
Planning

Due dates, priorities and holds show where the backlog really is.

Expert Review
Reviewed by the Oxmaint AI maintenance team

Write the close-out for the next person, not for the report. A good completion note says what was found, what was done and what to watch, and picks a cause code honestly, including No fault found. That is what makes a work order history worth reading a year later. Editorial guidance, not a quote from a named person.

Frequently Asked Questions

What is a work order in maintenance?
The written instruction and the record of one maintenance job on an asset: what to do, who does it, the parts and time, and what was done. Sign up to see one.
What is the difference between a request and a work order?
A request is someone asking for work. A work order is the job once it has been approved, with an asset, a priority and someone assigned. Sign up to see both.
What types of work order are there?
In Oxmaint, corrective, preventive, inspection and breakdown. They are the same kind of record, so one asset history shows every type. Sign up to filter by type.
Who closes a work order?
The technician completes it with a summary of the work done. A checker can then close it with an optional note. Only a manager or admin can reopen a closed job. Sign up to try it.
How is the due date set?
From the priority: Critical 1 day, High 3, Medium 7 and Low 14, unless a date is given, for example the date a requester asked for. Sign up and raise one.
Can a work order list the parts it needs?
Yes. The job lists its parts and quantities, and the portal checks the shelf and every other open job that wants the same part. Sign In to Access Micro App

See a Work Order From Raised to Closed

Open real sample jobs and move one through its stages. Sign up and explore the micro app.


Share This Story, Choose Your Platform!