A work order is the record of one maintenance job: the machine it is on, what is wrong or what is planned, who is doing it, the parts and time it takes, and what was actually done. Every repair, planned service and inspection a maintenance team does should have one, because it is the only place the history of a machine gets written down. This guide explains the parts of a work order and how one moves from raised to closed in a CMMS. Sign up to open a sample work order on a sample plant.
What Is a Work Order in Maintenance?
What goes on a work order, the statuses it moves through and why the record matters. Sign up and open a real sample job.
A Work Order in One Line
A work order is the written instruction and the record of a single maintenance job on an asset: what to do, who does it, with which parts and time, and what was done when it finished.
What Goes on a Work Order
| Part | What it holds |
|---|---|
| Title and description | What is wrong, or what the planned job is |
| Type | Corrective, preventive, inspection or breakdown |
| Priority | Critical, high, medium or low; the due date follows from it |
| Asset | The machine the work is on, plus any others it also affects |
| Assigned to | A technician or an outside vendor or contractor |
| Tasks and parts | The steps, the trade for each, and the parts the job needs |
| Time and cost | Estimated hours, then the hours, parts and costs actually booked |
| Close-out | A summary of the work done, the cause and whether a follow-up is needed |
A Real Sample Record
Sample plant records from the Oxmaint portal, captured 26 Nov 2026. Sign up to open it.
Open a Sample Work Order
See the tabs, the parts panel and the history on a real sample job. Sign up to the micro app and look.
The Statuses a Work Order Moves Through
A job moves forward one stage at a time, and each move asks for the one thing the next stage needs. These are the stages in Oxmaint and what each asks.
Raised, with nobody on it yet.
Who is doing the job; the due date fills in from the priority (Critical 1 day, High 3, Medium 7, Low 14).
A start note, and "Safety steps done?" where a permit, lockout or safety checklist applies.
Why it is waiting: parts, a production stop window, another trade or an approval, with an expected date.
A summary of the work done, with time, downtime, parts used and the cause.
An optional check note and who checked. Only a manager or admin can reopen a closed job.
Four Types, One Kind of Record
Preventive, corrective, breakdown and inspection jobs are all work orders. They differ by type, not by living in a different system, so one asset history shows them all.
Sample plant records from the Oxmaint portal's Reports, captured 26 Nov 2026: 140 work orders in total.
Why the Record Matters
What was done to a machine, when and by whom, in one place rather than in notebooks.
Hours, parts and outside costs booked on the job they belong to.
Due dates, priorities and holds show where the backlog really is.
Write the close-out for the next person, not for the report. A good completion note says what was found, what was done and what to watch, and picks a cause code honestly, including No fault found. That is what makes a work order history worth reading a year later. Editorial guidance, not a quote from a named person.