A logbook only helps if what is written in it can be found and trusted later. Oxmaint keeps three: the Maintenance Logbook, a record of work done on equipment that waits for a supervisor's sign-off; Logbook Routes, operator rounds where each reading is judged against a normal range and a trip band; and the Shift Logbook for handovers. A reading outside the trip band raises a work order. Sign up to walk a sample round with real limits on every point.
Maintenance Logbook & Operator Rounds Software
Work logged and signed off, rounds that raise jobs when a reading trips. Sign up and walk a sample route.
Six Sample Routes
Sample plant records from the Oxmaint portal's Logbook Routes, captured 26 Nov 2026: 6 routes, 3 due today, 6 failed parameters, average completion 64%. Line 2 finishing round is overdue by 1 day; the warehouse round is scheduled.
Two Bands on Every Reading
| Point | Normal range | Trip band | Outside normal | Outside trip band |
|---|---|---|---|---|
| Bearing temperature | 40-75 °C | 25-90 °C | Warning | Failed, job raised |
| Discharge pressure | 5.5-8.5 bar | 4.2-9.6 bar | Warning | Failed, job raised |
| Vibration | 0-4.5 mm/s | Up to 7.1 mm/s | Warning | Failed, job raised |
| Motor current | 18-32 A | 11-38 A | Warning | Failed, job raised |
Default point limits read from the portal's Logbook Routes; each route can set its own.
Walk a Sample Round
Enter readings on a route and see a warning and a failed point raise a job. Sign up to the micro app and try it.
What a Failed Reading Raises
Illustrative example of the job a failed reading raises; the format is read from the portal. The operator can untick a job before saving the round.
The Maintenance Logbook
Each entry records the work order, the asset, the technician, the date, the hours and the parts, and waits for a supervisor's sign-off, with who signed and when. Example: WO-2637, CNC Machining Center 02, Andre Williams, 19 November, 12 hours, awaiting sign-off. Sign up to sign one off.
Sample plant records from the Maintenance Logbook, captured 26 Nov 2026.
Handover notes and breakdowns are logged by shift in the Shift Logbook: 21 entries on the sample plant, with 9 handovers waiting to be acknowledged. A note and a round from the same shift can both be found later.
Set the trip band where you would stop and send someone, and the normal range where you would start watching. If every round throws warnings, the normal range is too tight and operators stop reading them. Sign off logbook entries weekly so the record is checked while the work is still remembered. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Logbooks You Can Find and Trust Later
Signed-off work, rounds with real limits, handovers by shift. Sign up and explore the micro app.