Runway Lighting Audit Checklist

By Josh Turly on June 29, 2026

runway-lighting-audit-checklist

A runway lighting audit checklist reviews circuit continuity, fixture condition, alignment, and control system response for every lighting category on the airfield — approach, threshold, edge, centerline, touchdown zone, taxiway, and stop bar — so that night operations and low-visibility procedures always have a verified visual guidance path. A single inoperative or misaligned fixture in a critical zone is a NOTAM event; a pattern of failures across a circuit is an airside safety issue. Sign Up Free on Oxmaint to log runway lighting audit findings against each circuit and fixture asset across your airfield. Book a Demo to see how Oxmaint tracks lighting inspection status, routes circuit faults to assigned electricians, and maintains an audit-ready compliance record across your full airfield lighting infrastructure.

Keep Your Airfield Lighting Audit-Ready and Defect-Free Log runway lighting findings against each circuit and fixture, and route faults to assigned electricians before a NOTAM is required.

1. Runway Edge & Centerline Fixture Inspection

Walk the runway or conduct a vehicle inspection pass to confirm each edge and centerline fixture is operational, undamaged, and seated correctly in its housing.

2. Approach & Threshold Lighting Checks

Approach and threshold lighting is the first visual guidance system a crew sees — any gap here affects procedure availability for the entire runway end.

3. Circuit Continuity & Electrical System Checks

Circuit faults are invisible from a visual walk — electrical checks confirm the system delivering power to every fixture is intact.

4. Taxiway, Stop Bar & Guidance Sign Lighting

Taxiway lighting errors cause runway incursions — confirm stop bars, lead-on/off lights, and guidance signs are fully operational before night ops begin.

5. Alignment Verification & Visual Aids Check

Fixtures that are operational but misaligned still fail their purpose — include a physical alignment check in every audit cycle.

Maintain a Verified, Audit-Ready Airfield Lighting Record Oxmaint logs runway lighting audit findings, routes circuit faults to work orders, and tracks compliance status across every airfield zone.

Frequently Asked Questions — Runway Lighting Audit

1. What does a runway lighting audit checklist cover?
It covers runway edge, centerline, touchdown zone, approach, and threshold fixture condition, circuit continuity checks, taxiway and stop bar lighting verification, alignment of inset fixtures, and PAPI or VASIS glidepath confirmation.
2. How often should airfield lighting audits be conducted?
Regulatory requirements and ICAO guidance typically call for daily inspection of operational lighting before night operations, with more detailed circuit and alignment checks at monthly and annual intervals depending on airport category.
3. What triggers a NOTAM for runway lighting?
Any failure that reduces the usability of an instrument procedure, degrades a required lighting category, or affects stop bar function in low-visibility operations typically requires a NOTAM until the fault is rectified and the circuit verified.
4. How does Oxmaint support runway lighting audit management?
Oxmaint logs fixture and circuit findings against each airfield asset, routes faults to corrective work orders with NOTAM status flags, and maintains a timestamped audit record that supports both regulatory compliance and internal safety review.
5. Can airfield lighting audit records be tracked across multiple runways?
Yes — Oxmaint tracks audit completion status, open defects, and service history across every runway, taxiway, and approach lighting circuit in the airfield, giving airside management a single compliance view across the full infrastructure.
Ready to Make Airfield Lighting Audits Traceable and Compliant? Oxmaint connects circuit asset records, inspection findings, and corrective work orders into one view for your airside maintenance team.