An aerial lift or an overhead crane should not be used until someone has checked it that shift. Oxmaint's Daily Checks give operators a pre-start inspection for elevating work platforms, after ANSI A92.22/24, and a pre-shift inspection for overhead cranes, after ASME B30.2 and OSHA 1910.179(j)(2). Every item is Pass or Fail; any fail raises a corrective work order, and a critical fail marks the machine do not use until it is fixed. Sign up to walk a sample check from a phone.
Aerial Lift & Overhead Crane Pre-Start Checks
Pass or Fail on every item, a work order for every fail, and do not use on a critical one. Sign up and try both checks.
Today on the Sample Plant
Sample plant records from the Oxmaint portal's Daily Checks, captured 26 Nov 2026. Not checked yet: Forklift 02 and EWP 01.
Aerial Lift Pre-Start Inspection
Walk a Sample Pre-Start Check
Open the aerial lift or crane check on a phone and answer each item. Sign up to the micro app and try it.
Overhead Crane Pre-Shift Inspection
| Item | Critical |
|---|---|
| Pendant buttons, e-stop and warning horn work | Yes |
| Hoist upper limit stops the hook block | Yes |
| Hook latch closes; hook not twisted, cracked or opened up | Yes |
| Wire rope: no kinks, crushing, birdcaging or broken wires | Yes |
| Hoist and bridge brakes stop and hold without drift | Yes |
| Rope seated in the drum grooves and sheaves | No |
| Bridge and trolley travel without binding or unusual noise | No |
| No oil leaking from the hoist gearbox | No |
| Rated capacity marked and legible from the floor | No |
Item list read from the portal's overhead crane pre-shift check, basis ASME B30.2 pre-shift and OSHA 1910.179(j)(2).
What a Fail Does
A corrective work order is raised on the machine
The operator's note says what was wrong
Priority Medium
The same work order, at High priority
The job says: do not use the machine until this job is closed
Counted under Do not use
Started From the QR Label
The operator scans the label on the lift or crane.
Every item Pass or Fail; a blank item is not a pass.
A fail asks what was wrong.
The check is kept with the asset, and any job is raised.
Keep the critical list short and honest. If every item is critical, operators learn to tick through. Make the ones that can hurt someone critical, such as emergency lowering, the upper limit and the hook latch, and treat a not checked machine as a finding in its own right. Editorial guidance, not a quote from a named person.