A crane, a forklift or a pressure vessel can be in perfect order and still not be allowed to run, because its certificate has lapsed. Oxmaint keeps each certificate on the asset it covers, with its type, issuer, issued date and expiry date, and works out its status from the date: Valid, Expiring Soon within 30 days, or Expired. Renewals keep the old dates and references as history. Sign up to open a sample certificate register with 13 certificates in it.
Equipment Certificate & Inspection Expiry Tracking
Crane, forklift, aerial lift, pressure vessel and calibration certificates on the asset they cover. Sign up and see the register.
The Sample Register at a Glance
Sample plant records from the Oxmaint portal's Certificates, captured 26 Nov 2026. Expiring soon: MIG Welding Station 03 calibration, 01 Dec 2026, in 5 days.
How the Status Is Worked Out
Nobody sets the status by hand. It is read from the expiry date each time, so a certificate cannot be left showing Valid after it lapses. Sign up to see the rule.
Certificate Types on the Sample Plant
| Certificate | Issued by on the sample plant |
|---|---|
| Crane periodic inspection (OSHA 1910.179) | Bureau Veritas |
| Calibration | SGS, or in-house |
| Powered industrial truck inspection (OSHA 1910.178) | As recorded per truck |
| Pressure vessel (ASME) | As recorded per vessel |
Sample plant records from the Oxmaint portal's Certificates, captured 26 Nov 2026.
Open the Sample Certificate Register
See each certificate on its asset, its status and the one expiring next. Sign up to the micro app and look.
What a Certificate Record Needs
Renewals Keep the History
Certificates expiring in the next 30 days are counted on the EHS dashboard beside open incidents and active permits, so a planner can book the inspection before the date passes.
Book the inspection when a certificate turns Expiring Soon, not when it turns Expired. Thirty days is often barely enough for an outside inspector. Keep the certificate on the machine record, so the person raising a job on that machine sees its status too. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Never Miss a Certificate Expiry
Every certificate on its asset, with a status read from the date. Sign up and explore the micro app.