A plant manager asks two questions every morning: which lines are running, and how did they run last month. Oxmaint's Plants & Lines answers both. It holds every plant, area and line as a place, shows each line as running, down, in changeover or in a planned stop, and works out 30-day availability, OEE, MTBF and MTTR from the plant's own work orders and downtime records. Sign up to open Plants & Lines on a sample plant with 7 lines.
Plants & Lines: Line Availability, OEE, MTBF
Every line's status now and its last 30 days, from your own records. Sign up and open a sample plant.
The Sample Plant, Last 30 Days
Sample plant records from the Oxmaint portal's Plants & Lines, captured 26 Nov 2026: Columbus Plant, 11 areas, 7 lines, 64 machines, 1 line down at the time; 120.5 h unplanned downtime of 3,638.9 h planned. MTTR here is the mean duration of line stops closed in the 30 days.
Four Line States on the Board
Open the Sample Plant's Lines
See each line's status, then click into its downtime, machines and spares. Sign up to the micro app and look.
How Each Figure Is Counted
| Figure | Definition |
|---|---|
| Availability | Run time as a share of planned production time |
| OEE | Availability x performance x quality, where production counts exist |
| MTBF | Run time divided by the number of unplanned stops |
| MTTR | Mean duration of the unplanned stops closed in the period |
| Bad actors | Machines with two or more unplanned stops; the top five listed |
A card with no data says what is missing, such as Add production counts to see OEE, rather than showing a zero.
Inside a Line
Sample plant records, captured 26 Nov 2026: 8 bad actors, led by CNC Machining Center 03 with 11 stops; 7 critical spares short, 2 out of stock; downtime cost $193,463.
Plants, areas and lines are places. Only machines are counted as equipment, so a line never takes up a slot in your asset register or limit.
Log every stop against its line with a reason, including short ones, and the figures fill themselves in. Read availability and MTBF together: a line with good availability but a falling MTBF is stopping more often for shorter times, which usually points to a small, fixable cause. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Every Line, Now and Over the Last 30 Days
Status, availability, OEE, MTBF and MTTR by line. Sign up and explore the micro app.







