Most plants already keep their equipment list in a spreadsheet. Oxmaint's importer reads that file as it is, an Excel workbook or a CSV, and loads sites, lines, assets, parts and work orders in five steps: choose what, upload the file, match the columns, check the rows, save. Rows with a problem are listed by line and column, and every save can be undone. Sign up to try the importer with a template, and sample records never count toward your plan's asset limit.
How to Import Assets, Parts and Jobs from CSV
Bring the spreadsheet you already have, fix what the check finds, and undo a batch if you need to. Sign up and download a template.
The Five Steps
Templates for assets, work orders and parts can be downloaded at the start. You do not have to use them: column names can be in any spelling and need not be on the first row. Sign up to download one.
Import in This Order
Import assets before the work orders that name them: the importer matches a job to an asset you already loaded and will not invent one from a name it cannot find.
Download a Template and Try It
Fill a few rows, upload them and see the column match and the check. Sign up to the micro app and import.
What the Reader Copes With
Checks and Duplicates
| Check | What happens |
|---|---|
| Each row and column | A problem is reported against the row and the column it is in |
| Already in the register | Matched on its natural key, so it is not loaded twice |
| Twice in the same file | Found and reported, not loaded twice |
| Asset key | The asset code when given, else the serial, else site + line + name |
Illustrative example using sample-plant asset names; not a captured import.
Rows with problems can be downloaded as a CSV for whoever made the file. Each save is a batch with its own Undo, and recent imports are listed with theirs.
Clean the asset codes before anything else. A unique code per machine is what lets the importer recognise a row next time and keeps work orders matched to the right asset. Import a small batch first, check it on screen, then load the rest. Editorial guidance, not a quote from a named person.
Frequently Asked Questions
Bring Your Spreadsheet In
Sites, lines, assets, parts and work orders, checked and undoable. Sign up and explore the micro app.







