Your refinery shuts down for 32 days every 4 years. In that 32-day window, 1,400 contractors mobilize, 8,400 work orders execute, 12,000 permits-to-work get issued, and every extra day past plan costs you...
Oxmaint brings sovereign, on-premise AI-powered maintenance management to SAP ECC and S/4HANA — powered by NVIDIA DGX. Predictive maintenance, intelligent work orders, AI vision inspection, and full compliance automation. All in your data center. Zero cloud dependency.
Bi-directional SAP PM/MM/EHS sync
Sensor data + SAP PM history predicts failures 2–8 weeks ahead. Auto-creates work orders and triggers spare parts via SAP MM.
Technicians describe problems in plain English. AI creates structured SAP PM orders with task lists, materials, and priority.
Cameras detect defects, corrosion, leaks during rounds. Results auto-logged in SAP PM with annotated images. Edge inference.
AI shifts from fixed schedules to condition-based triggers. Reduces over-maintenance by 30% while improving availability.
Auto-generates regulatory reports from SAP PM/EHS data. Validates permit-to-work in real-time. OSHA, ISO 45001, JCAHO.
Predicts parts demand from failure forecasts + SAP PM history. Auto-raises SAP MM POs. Prevents stockouts and excess inventory.
The entire Oxmaint AI brain runs on NVIDIA DGX in your data center. No cloud subscriptions. No per-query costs. No maintenance data ever leaves your building. Also deploys on AWS, Azure, GCP VPCs for hybrid scenarios.
AI monitors production equipment across all lines — predicting failures, optimizing PM schedules, and automating SAP workflows.
Vibration + thermal sensors on motors, pumps, compressors. AI predicts bearing failures 3–6 weeks ahead. Auto-creates SAP PM work orders and triggers spares via MM.
Cameras inspect equipment surfaces, welds, structural components. Detects corrosion, cracks, wear. Every finding auto-logged in SAP PM with annotated photos.
AI optimizes shutdown scope, sequence, duration from asset condition data. Predicts which assets can run to next shutdown vs immediate attention. 35% shorter shutdowns.
AI-powered fleet maintenance eliminates reactive breakdowns, optimizes service by vehicle usage, and integrates OBD telematics into SAP PM.
OBD-II/III data streams into AI. DTC codes auto-converted to SAP PM work orders with equipment and task assignments.
Shifts from mileage-based to condition-based. Heavy-use vehicles get earlier service. 25% less unnecessary PM cost.
AI correlates SAP FI costs vs planned budgets per vehicle. Identifies replace vs repair decisions. Auto-posts to SAP FI.
AI monitors HVAC, electrical, plumbing, elevators — predicting failures before occupants notice. Full SAP PM cost tracking.
Predicts chiller wear, refrigerant leaks, filter saturation. Auto-creates SAP PM service orders before complaints.
Tracks electricity, water, gas per floor/zone. Detects anomalies. Reduces utility costs 22% through optimized scheduling.
AI categorizes, prioritizes, routes requests. SAP PM work order created instantly. SLA tracking + SAP RE-FX cost posting.
AI keeps assets in peak condition, tracks lease compliance, and optimizes spending across portfolios — integrated with SAP RE-FX and PM.
AI reads SAP RE-FX leases and auto-schedules maintenance before SLA deadlines. Auto-generates compliance certificates.
Scores vendor performance. Auto-assigns WOs to highest-rated contractor. Validates completion with AI vision before invoice approval.
Tracks age, condition, replacement cost across portfolios. Recommends CapEx priorities. Feeds SAP FI budgeting directly.
AI-powered public infrastructure maintenance — maximum asset life, regulatory compliance, full audit transparency. Zero cloud dependency.
Full AI stack offline. Zero external API calls. For defense, classified facilities, sensitive infrastructure. FIPS 140-2.
Roads, bridges, water treatment via IoT. Prioritizes spending by safety risk. SAP PM + PSM tracking.
Auto-generates compliance reports, inspection certs, budget summaries from SAP PM/EHS. 85% less prep time.
Medical equipment, HVAC, sterilization always operational. JCAHO, FDA, OSHA compliance maintained automatically from SAP.
Tracks usage cycles, calibration, service history for MRI, CT, ventilators. Predicts failures. FDA 21 CFR Part 11 audit trail.
OR temperature/humidity, pharmacy refrigeration, sterile processing. AI flags deviations before JCAHO thresholds breach.
Auto-generates EC reports, life safety records, utility management docs from SAP PM. Survey prep: weeks to hours.
SAP ECC 6.0, 500+ CNC machines, 3 plants. Bearing failures caused 2–3 unplanned shutdowns/month. Oxmaint on DGX B200, trained on 4 years of SAP PM history.
SAP S/4HANA on-prem, 1,200+ pump stations. Air-gapped for FIPS 140-2. Oxmaint on DGX SuperPOD — fully offline AI.
SAP ECC, medical equipment + HVAC + building systems across 14 hospitals. HIPAA + JCAHO required on-prem. DGX B200.
SAP ECC fleet, 3,200 HGVs. OBD-II into Oxmaint AI. DTC codes auto-converted to SAP PM work orders. DGX Spark at 8 depots.
NVIDIA doesn't build SAP PM connectors, train predictive models on your asset history, or wire AI vision to inspection workflows. Oxmaint turns DGX into a working SAP maintenance copilot — in 8–12 weeks.
| Capability | DGX Alone | + Oxmaint |
|---|---|---|
| SAP PM/MM/EHS connectors | Pre-built | |
| Maintenance AI copilot | Ready | |
| AI vision → SAP PM | Wired | |
| PdM on your asset data | Trained | |
| Go-live | 12–18 mo | 8–12 wk |
Up to 500 assets, 1–2 sites. Oxmaint pre-configured on delivery.
500–10K assets, 2–10 sites. Full maintenance AI suite in 8–12 wk.
50K+ assets, 50+ sites. Global maintenance AI factory.
| Scale | Assets | Sites | Tier |
|---|---|---|---|
| SME | Up to 500 | 1–2 | Spark |
| Mid-Market | 500–5K | 2–10 | B200 |
| Enterprise | 5K–50K | 10–50 | B200 x2–4 |
| Global | 50K+ | 50+ | SuperPOD |
NVIDIA provides compute. Oxmaint provides the SAP maintenance brain — PM connectors, failure models, work order copilot, vision pipeline, compliance engine.
Connects to your existing VPC — no new accounts, no data migration, no exposure.
Vibration, temperature, pressure, ultrasonic, current sensors feed directly into Oxmaint AI — triggering predictive alerts and auto-creating SAP PM work orders.
| Sensor | Reading | Threshold | Alert |
|---|---|---|---|
| VIB-P14 | 7.8 mm/s | 6.0 | Critical |
| TMP-M07 | 92°C | 85°C | Inspect |
| PRS-B03 | 4.3 bar | 5.0 | Normal |
| ULT-C08 | 42 dB | 38 dB | Monitor |
| AMP-F01 | 18.2 A | 22.0 A | OK |
DGX racked. SAP PM/MM connectors configured. Security review.
3+ years SAP PM data extracted. Asset-specific PdM models trained. IoT calibrated.
Priority assets piloted. NLP work orders tested live. EHS reports validated.
All assets onboarded. Team trained. Quarterly retraining scheduled.
Every SAP discrete plant has the same conversation in 2026. The SAP Account Executive says "PCo is being phased out, you need to move to SAP Production Connector and SAP DM in the cloud." The plant IT lead...
Every consultant offering you an SAP MES transition will hand you a 5-phase roadmap. Assess. Pilot. Expand. Cutover. Optimize. The phases are not where projects go wrong. The wrong target architecture in Phase 1...
December 31, 2030. That's the day SAP turns off support for SAP MII and SAP ME. No more patches, no more security updates, no more SAP help desk. If your discrete plant is running on MII today — connecting CNC...
Automotive OEMs run two different clocks. The MES clock — tracking every vehicle through body, paint, and trim — and the maintenance clock — keeping every weld gun, robot arm, conveyor drive, and paint...
The math is brutal: an NVIDIA GB200 NVL72 rack generates 120 kilowatts of continuous heat. The ceiling for air cooling is around 25 kilowatts per rack. That's a 5× gap on the conservative end and a 15× gap on...
Concrete foundations don't fail dramatically. They fail invisibly — a hairline crack at the rebar interface today, a propagating fracture in six months, a load-bearing failure in two years that everyone...
It's 02:14 on a Tuesday. The capper on Line 3 fails at the worst possible moment — mid-shift, mid-batch, with three trucks waiting at the dock. Lost output is running at $3,000-$5,000 per minute. The...
A bearing developing pitting damage emits its first frequency anomaly at 0.4× running speed — about 12 weeks before the same fault becomes audible to a human, and 3–6 months before thermal sensors detect...
A BMS without AI is a data logger. It records temperatures, pressures, runtimes, and alarm states — but it does not learn, predict, or act. In 2026, facility teams are no longer...
70% of all machine failures trace back to lubrication. Not bearings. Not vibration. Not even electrical faults. The oil itself — degraded, contaminated, or wrong-spec — is the root cause behind two out of...
A 1mm compressed air leak whistles at 38–42 kHz — about an octave above the highest note any human ear can hear. A bearing six weeks from catastrophic failure clicks at 25–35 kHz with a pattern your...
A coordinated attack on 50 "low impact" wind turbines now produces a "High Impact" grid event under NERC's 2026 framework. A control center losing visibility to substation telemetry for 4 hours is a CIP-012-2...
Reactive maintenance costs 3 to 5 times more than preventive maintenance when you factor in emergency labour, expedited parts, lost production, and collateral damage. Yet most facilities still spend 60 to 80...
Most maintenance teams don't fail because they lack effort — they fail because their work orders live in spreadsheets, WhatsApp threads, and sticky notes on toolboxes. The result is predictable: tasks slip,...
At 11:47 PM on a Wednesday, a PLC controlling a packaging line's fill station registered a torque overload fault on the primary drive motor — fault code F-0429. The alarm flashed on the SCADA screen for 6...
PM (Plant Maintenance), MM (Materials Management), EHS (Environment, Health & Safety), FI/CO (Finance & Controlling), QM (Quality Management), RE-FX (Real Estate), PSM (Public Sector Management), HR, and SD. Integration through BAPI, RFC, OData, IDOCs, and REST APIs — zero custom ABAP development needed. Works with SAP ECC 6.0, R/3, S/4HANA on-premise, and S/4HANA Private Cloud.
Oxmaint extracts 3+ years of SAP PM work order history, failure records, and maintenance costs, then trains asset-specific failure prediction models on your NVIDIA DGX hardware. These models correlate your historical failure patterns with real-time sensor data (vibration, temperature, pressure, motor current) to predict equipment failures 2–8 weeks before they occur. Predictions automatically trigger SAP PM maintenance orders and SAP MM spare parts procurement — not generic alerts, but structured work orders with correct task lists, materials, and cost assignments.
It depends on your scale. DGX Spark (from $4,699) handles up to 500 assets across 1–2 sites — ideal for SMEs and single-plant operations. DGX B200 ($300K–$500K) serves 500–10,000 assets across 2–10 sites for mid-large enterprise. DGX SuperPOD provides rack-scale AI for 50,000+ assets across 50+ global sites. AI vision inspection runs on NVIDIA Jetson or L4 GPUs at the edge. We also fully deploy on AWS EC2, Azure ND, or GCP A3 instances within your VPC for hybrid scenarios.
Yes. Technicians describe a problem in plain English — for example, "Compressor C-14 is making a grinding noise and running hot." The AI copilot creates a structured SAP PM work order with the correct equipment number, failure code, task list, estimated materials from SAP MM, priority classification, and technician assignment. This reduces work order creation time by 60% and eliminates manual data entry errors. The copilot inherits SAP authorization objects, so technicians only access equipment they're assigned to.
Yes. Oxmaint supports existing IP cameras via ONVIF and RTSP protocols, industrial thermal cameras (FLIR), and machine vision systems from Cognex, Keyence, and Basler. Edge AI inference runs locally on NVIDIA Jetson hardware — sub-100ms detection speed, no cloud required. Every inspection finding is automatically logged in SAP PM with annotated evidence images, severity classification, and recommended corrective actions.
Yes. The entire Oxmaint stack — DGX hardware, NeMo models, RAPIDS analytics, NIM inference engine, and SAP PM/MM/EHS connectors — runs fully offline with zero external API calls. This is specifically designed for defense installations, classified government facilities, pharmaceutical manufacturing, and regulated industries requiring complete network isolation. FIPS 140-2 compliant deployment available.
Full platform deployment including hardware installation, SAP PM/MM/EHS connector configuration, predictive model training on your asset data, AI vision station setup, and technician onboarding: 8–12 weeks. AI vision inspection stations for specific equipment lines can be live in as little as 14 days. The turnkey package includes ongoing support, quarterly model retraining as new failure patterns emerge, and continuous performance monitoring.
Oxmaint's AI predicts spare parts demand based on equipment failure forecasts and SAP PM maintenance history. It dynamically adjusts safety stock levels, auto-raises SAP MM purchase orders when stock drops below calculated thresholds, and prevents both stockouts during critical failures and excess inventory write-offs. In pilot deployments, this reduced spare parts inventory by 28% while maintaining zero stockouts on critical components.
GDPR, HIPAA, EU AI Act (August 2026), FDA 21 CFR Part 11, ISO 27001, ISO 45001 (Occupational Safety), ISO 14001 (Environmental), SOC 2 Type II, DORA, FIPS 140-2, JCAHO (Healthcare accreditation), and OSHA. Oxmaint AI agents continuously scan SAP PM, EHS, and sensor data to auto-generate audit trails, compliance documentation, permit-to-work validations, and regulatory reports — turning weeks of manual preparation into hours.
Yes. The same Oxmaint maintenance AI copilot deploys on your VPC/VNet on any hyperscaler — AWS EC2 P5 with SageMaker and Bedrock, Azure ND H100 v5 with Foundry, or GCP A3 Mega with Vertex AI. Data stays within your cloud tenant. Hybrid architectures with AWS Direct Connect, Azure ExpressRoute, or GCP Interconnect link to on-prem SAP. Same 8–12 week deployment, same zero custom ABAP.
Predictive Maintenance + AI Work Orders + Vision Inspection + EHS Compliance + Smart Sensors + Spare Parts AI. All on-prem. 8–12 weeks.
NVIDIA DGX Partner · SAP Certified Integration · oxmaint.com